| JUDUL | : | Evaluasi Pelaksanaan Program Pembangunan Irigasi di Desa Murung Baru Kecamatan Tanta Kabupaten Tabalong | |
| PENGARANG | : | NORHIDAYANTI | |
| PENERBIT | : | UNIVERSITAS LAMBUNG MANGKURAT | |
| TANGGAL | : | 2026-07-23 |
ABSTRAK
Norhidayanti, 2210413320035, 2026 Evaluasi Pelaksanaan Program
Pembangunan Irigadi di Desa Murung Baru Kecamatan Tanta Kabupaten
Tabalong. Di bimbing oleh Ibu Sandra Bhakti Mafriana.
Penelitian ini bertujuan untuk mengetahui evaluasi pelaksanaan
pembangunan irigasi di Desa Murung Baru Kecamatan Tanta Kabupaten Tabalong.
Pembangunan irigasi dilaksanakan sebagai salah satu bentuk upaya pemerintah
desa dalam membantu penyediaan pengairan bagi lahan pertanian masyarakat.
Keberadaan irigasi diharapkan dapat membantu kelancaran distribusi air sehingga
kebutuhan pengairan masyarakat dapat terpenuhi dengan lebih baik. Penelitian ini
menggunakan pendekatan kualitatif dengan metode deskriptif. Teknik
pengumpulan data dilakukan melalui observasi, wawancara, dan dokumentasi,
selanjutnya di analisis melalui tahapan reduksi data, penyajian data, dan penarikan
kesimpulan. Penelitian ini juga menggunakan teori evaluasi menurut William N.
Dunn yang meliputi efektivitas, efisiensi, kecukupan, pemerataan, dan
responsivitas.
Hasil penelitian menunjukkan bahwa pelaksanaan pembangunan irigasi di
Desa Murung Baru masih belum optimal. Kondisi tersebut dipengaruhi oleh
keterbatasan sumber air serta distribusi air yang belum mampu menjangkau seluruh
lahan pertanian masyarakat. Selain itu, keterbatasan anggaran dan hambatan
pelaksanaan pembangunan turut mempengaruhi hasil di lapangan. Meskipun,
pemerintah desa telah melakukan beberapa upaya untuk mengatasi permaslaahan
tersebut dengan pembersihan sumber air dan merencanakan penambahan sumber
alternatif, namun hasilnya masih belum mampu mengatasi permasalahan pengairan
secara menyeluruh.
Berdasarkan hasil penelitian tersebut, pemerintah desa diharapkan dapat
melanjutkan pembangunan saluran irigasi, merealisasikan untuk penambahan
sumber air alternatif, serta melakukan pemeliharaan saluran dan sumber air secara
rutin agar kebutuhan pengairan lahan pertanian masyarakat dapat terpenuhi dengan
lebih baik.
Kata Kunci: Evaluasi Pelaksanaan Program, Pembangunan Irigasi
ABSTRACT
Norhidayanti, 2210413320035, 2026. Evaluation of the Implementation of the
Irrigation Development Program in Murung Baru Village, Tanta District,
Tabalong Regency. Supervised by Sandra Bhakti Mafriana.
This study aims to determine the evaluation of the implementation of the irrigation
development program in Murung Baru Village, Tanta District, Tabalong Regency.
Irrigation development was carried out as one of the village government's efforts
to support the provision of water for community agricultural land. The existence of
irrigation is expected to help facilitate water distribution so that the irrigation
needs of the community can be fulfilled more effectively. This study used a
qualitative approach with a descriptive method. Data collection techniques were
conducted through observation, interviews, and documentation, which were then
analyzed through the stages of data reduction, data presentation, and conclusion
drawing. This study also applied the evaluation theory proposed by William N.
Dunn, which includes effectiveness, efficiency, adequacy, equity, and
responsiveness.
The results of the study indicate that the implementation of irrigation development
in Murung Baru Village has not been fully optimal. This condition is influenced by
limited water sources and water distribution that has not been able to reach all
community agricultural lands. In addition, budget limitations and obstacles during
the implementation process also affected the results of the development in the field.
Although the village government has made several efforts to overcome these
problems through cleaning water sources and planning additional alternative
water sources, these efforts have not been able to comprehensively resolve
irrigation problems.
Based on the results of this study, the village government is expected to continue
the development of irrigation channels, realize the addition of alternative water
sources, and carry out routine maintenance of irrigation channels and water
sources so that the irrigation needs of community agricultural land can be fulfilled
more effectively.